Coming Soon to the Field Mobile App 26.0 Release
This release rolls out in phases. Improvements will appear first, followed by new features, over a two-week period. You may not see all changes at once.
To check your release version, open the Field Mobile App and go to Menu
> About
. For steps on how to manually update your release version, see Update the Field Mobile App.
Overview
Some customers set a spending limit on a work order, called the not-to-exceed (NTE) limit. The Field Mobile App shows how much of that limit you’ve used. If the work needs more room, you can ask your office for an increase without leaving the work order.
Who uses this feature
Technicians
Primarily benefits Commercial Service and Replacement business types and Commercial Construction business types
Applies to all trades
Feature configuration
The Field Mobile App is optimized for iOS, iPadOS, and Android phones and tablets. For more, see System requirements and mobile app information.
If you’re using the Field Mobile App and need support, please contact Technical Support (through the office) or reach out directly to support@servicetitan.com.
Account configuration and office setup are required to use this feature. Please contact your office for details.
The following permissions are required to use this feature. Please contact your office for details.
Request NTE Increase: lets you send an increase request to your office
View NTE Dollar Amounts: lets you see dollar amounts instead of percentages only
Things to know
The limit comes from the work order. You can ask for an increase, but you can’t change the limit yourself.
Without the dollar-amount permission, you see percentages and time left only.
You get a push notification when a work order reaches its limit. You also get one when your office approves or denies a request.
The “time left” line is an estimate at your current pace. It’s hidden when the app can’t work one out.
Sending a request needs an internet connection. Your office approves or denies each request.
Best practices
Check the limit when you open the work order, so you know how much room you have.
Ask for more room at 75%, not at 100%. That leaves time for an answer before you hit the limit.
Say what changed in your request. A clear reason helps your office decide faster.
Add the equipment you’re working on if the request is about a failed part.
Call the office if the work is urgent. Don’t wait on the request alone.
Before you close out a work order at the limit, ask your office. Closing out over the limit could mean a rejected invoice.
Use cases
You open a work order and see 75%, with about an hour left at your pace. You send a request now so the office can call the customer.
A condenser fails during a maintenance visit. You send a request, choose the equipment, and wait for the answer.
Your office denies the request. You call the office and decide together whether to stop or continue.
You’re in a basement with no signal. The card still shows the last numbers, with the time they were refreshed.
Check how much of the limit you’ve used
Open the work order. The app shows the Not-to-Exceed Limit card on the Work Order tab.

Read the percentage and the amount used.
Note: If you don’t have the dollar-amount permission, you only see the percentage.
Read the status under the title. The status and the time left change as the work order uses more of the limit.
Tap the card to open the details. You see the Dollar limit, the amount used, and Last refreshed.

Pull down to refresh when you’re online.
Note: At 75% and higher, you also see a banner on the other work order tabs.
Ask your office for more room
On the Not-to-Exceed Limit card or bottom sheet, tap Request Increase.
Note: If you don’t see Request Increase, you don’t have the permission. Tap Call Office instead.
Choose a reason.
Work is taking longer than expected
Unexpected equipment failure
Part replacement exceeds the limit
Additional diagnostics required
Scope changed on site
Other

If you chose Other, add details in up to 200 characters.
Enter how many hours you need.
(Optional) Add notes for your office.

(Optional) Tap Select Equipment and choose the equipment this request is about. Search by name or model number.

Tap to send the request.
Check the status of your request
Open the work order. The card shows Review Pending and the date you sent the request.

When your office answers, you get a push notification. The card then shows either:
Request approved, with the new Dollar limit and a lower percentage.

Request denied, with the same limit as before

Decide what to do when you reach the limit
When the work order is at or over 100%, a sheet opens with This job is at its NTE Limit. It says: “Closing out a job now could result in a rejected invoice. If more work is needed, request an increase first.”
Choose one of the options:
Request Increase: Send an increase request, as described above.
Continue Past Limit: Keep working without asking for an increase. The app records this in the job history.
Continue with Job Closure: Go on to close out the work order.
If you don’t have the Request Increase permission, tap Call Office instead.

Caution: Closing out a work order over its limit could mean a rejected invoice. Talk to your office first.