--- title: "Equipment shows up twice on the project costing" slug: "equipment-shows-up-twice-on-the-project-costing" updated: 2026-10-15T00:48:34Z published: 2026-10-15T00:48:34Z canonical: "help.servicetitan.com/equipment-shows-up-twice-on-the-project-costing" --- > ## Documentation Index > Fetch the complete documentation index at: https://help.servicetitan.com/llms.txt > Use this file to discover all available pages before exploring further. # Equipment shows up twice on the project costing ![](https://cdn.document360.io/961862ab-d0f2-4d91-bb62-a62ee8184eff/Images/Documentation/anvil-wrench.png?sv=2026-02-06&spr=https&st=2026-10-31T03%3A47%3A29Z&se=2026-10-31T04%3A47%3A29Z&sr=c&sp=r&sig=EXBYDkznjunkZ0RN3fgIrD%2Fk2EGjLlf6Pn8IIQhi2%2BE%3D) Troubleshooting **Role:** Office employees · Accountants · Administrators · All business types**Area:** Inventory · Project Costing · Invoicing · All versions ## **What you're seeing** On a project, the actual expenses show the same piece of equipment counted twice. It appears once from an invoice and once from a bill, so the project's actual cost is higher than it should be. ## **Why this happens** There is one common reason. **Reason 1** **The item's cost is recorded in two places at once.** When an item is added to the job's invoice with a cost and the same item is also recorded on a bill or receipt, the project counts the cost from both places. That double entry inflates the project's actual expenses. ## **How to fix it** Run these checks in order. Most issues are resolved by Check 1. ### **1****Prevent future duplicates with the inventory invoice setting** Turning on this setting adds received job PO items to invoices at $0 cost, so their cost isn't counted twice going forward. > [!NOTE] > **Note:** This setting is only available if you have the Inventory module enabled. If you don't, use Check 2. 1. Go to **Settings > Inventory > Configuration > Invoice Settings**. 2. Check the box next to **Option to add inventory items to invoices**. This adds items to pending invoices at $0 cost when you receive job purchase orders. 3. When finished, click **Save**. > [!NOTE] > **✓ Done ·** Going forward, received job PO items are added to invoices at $0 cost, so the equipment is no longer counted twice on project costing. ### **2****Fix an existing duplicate by re-adding the item at $0** Use this for duplicates that already exist, or if you don't have the Inventory module. 1. In the main navigation bar, click **Search**. 2. In the **Search** dropdown, select **Invoices** and click the **Search** icon. Or narrow your search using filters. 3. Locate the invoice or bill where the equipment is listed with a cost, and click the **Invoice #** hyperlink. 4. In the **Equipment** section, remove the item that shows an amount under **Total Cost** by clicking the **X** to the right of the item. 5. In the left side menu, click **Add equipment**. 6. Select the equipment in the **Equipment Name** field. 7. If it isn't already, set the **Cost** field to $0.00. 8. Update any other fields as needed, then click **Save**. > [!NOTE] > **✓ Done ·** The equipment appears only once on the project costing, with the cost coming from a single source. ## **Still not working?** If the equipment still shows twice, contact ServiceTitan Technical Support at [**go.servicetitan.com/ask**](https://go.servicetitan.com/ask) with: - The project and the job/invoice number(s) - The equipment item name and where it appears with a cost (invoice, bill, or receipt) - Whether the item is an inventory item or a non-inventory item - Whether you use GL-Based Costing - Whether the duplicate came from booking a job from a sold estimate (see "Want to learn more?") - Which checks from this article you already tried ## **Want to learn more?** [**Manage double costing from chargeable materials ›**](https://help.servicetitan.com/construction/docs/manage-double-costing-from-chargeable-materials) How chargeable materials can be counted twice on a project's costs, and how to resolve it. [**Manage double costing from booking a job from a sold estimate ›**](https://help.servicetitan.com/construction/docs/manage-double-costing-from-booking-a-job-from-a-sold-estimate) How booking a job from a sold estimate can double-count costs on the project, and how to fix it.